The car park repair is underway when an extension to the existing storm water system. During detailed excavation, network has uncovered the boundary trap inspection opening, which have been asphalted over by
previous contractors. Network will raise and reinstate the inspection opening, which will assist with future maintenance issues.
Comentarios