Remedial Building Works

Network the remedial builder have been engaged to review and complete the fire upgrade to the Crown Hotel. On our inspection it was impossible to complete a pressure and flow test to the old system, as it didn't have an annubar line.

Network the remedial builder had to have the booster point removed and provide a landing valve on a 300mm branch piece of 65mm pipe. The test than ran through an ambit box.

Once again Network are the remedial builder of choice.