Network the remedial builder has been engaged to replace the failing glass sliding doors to the unit block located in Warrawee.
Originally Network were engaged to complete a water simulation test to confirm water ingress locaiton.
The scope of works includes
Remove existing glass sliding doors
Grind back existing hob
Install epoxy primer
Install water stop angle
Waterproof hob
Supply and install new sliding doors with storm molds
Tile hob
Supply and install vision strip to sliding doors
Once again Network are the remedial builder of choice for strata project across the state of NSW.
Comments